Tests Completed Under Minimum Time Report
This report provides a list of tests that were completed under the minimum time set in the training properties. You can use this report to evaluate if employees, organization units, and/or groups are taking the appropriate time to complete the test. By default, the report displays all tests. You can run the report for a single test as needed.

- Organization unit the employee belongs to
- Employee name
- Test title
- Date the test was completed
- Time the employee spent taking the test*
- Minimum time it takes to complete the training
- Variance. This detail is the difference between the actual time the employee took to complete the test and the estimated minimum time.
Report Parameters

Parameter | Default Value | Description |
---|---|---|
People | None selected. | Required. You can select multiple users, organization units, and groups. |
Date Range | Month To Date | Required |
Percent of Minimum Time | 80% | Required |
Employee Status | Active | Required |
Test | None selected. All tests are included by default. | Required |
* "Time in training" data may be affected by user behavior such as the user closing the browser during a training session, a network interruption during a training session, the user allowing the session to remain idle for longer than the timeout period, the user placing the computer into hibernation mode during a training, and the user starting multiple, concurrent versions of the same training session.